Time-cost-quality trade-off model for subcontractor selection using discrete particle swarm optimization algorithm

Araştırma sonucu: Kitap/Rapor/Konferans Bildirisinde BölümKonferans katkısıbilirkişi

4 Atıf (Scopus)

Özet

In general, construction projects consist of several work packages. The general contractors usually tend to sublet these work packages to various subcontractors. In such cases, general contractors are responsible for the quality of the work packages performed by the selected subcontractors. In this context, the success of a construction project and thereby the general contractor depends on the performances of the subcontractors. Therefore, one of the main problems that a general contractor faces is the selection of the right subcontractors for the right work packages. In most cases, general contractors make this decision at the beginning of the project and they have to evaluate potential subcontractors' performances in terms of time, cost and quality during the subcontractor selection process. After this evaluation process, they select an optimal combination of subcontractors that will carry out the work packages in the project. It is not an easy task for a general contractor to select the most appropriate combination, which balances the trade-off between time, cost and quality. The main objective of this study is to generate a discrete particle swarm optimization algorithm (DPSO), which will assist general contractors to select the most appropriate subcontractors that will carry out different work packages in a construction project considering the trade-off between time, cost and quality. In order to illustrate how this algorithm can be used in the subcontractor selection problem, the data obtained from a trade centre project is used. Findings of the research revealed that the proposed algorithm is satisfactory.

Orijinal dilİngilizce
Ana bilgisayar yayını başlığıProceedings of the 31st Annual Association of Researchers in Construction Management Conference, ARCOM 2015
EditörlerAni Raiden, Emmanuel Aboagye-Nimo
YayınlayanAssociation of Researchers in Construction Management
Sayfalar13-22
Sayfa sayısı10
ISBN (Elektronik)9780955239090
Yayın durumuYayınlandı - 2015
Etkinlik31st Annual Association of Researchers in Construction Management Conference, ARCOM 2015 - Lincoln, United Kingdom
Süre: 7 Eyl 20159 Eyl 2015

Yayın serisi

AdıProceedings of the 31st Annual Association of Researchers in Construction Management Conference, ARCOM 2015

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???31st Annual Association of Researchers in Construction Management Conference, ARCOM 2015
Ülke/BölgeUnited Kingdom
ŞehirLincoln
Periyot7/09/159/09/15

Parmak izi

Time-cost-quality trade-off model for subcontractor selection using discrete particle swarm optimization algorithm' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Alıntı Yap