Ana gezinime geç Aramaya geç Ana içeriğe geç

TBM cutting performance in Istanbul

  • N. Bilgin*
  • , C. Feridunoglu
  • , D. Tumaç
  • , M. Çinar
  • , L. Özyol
  • *Bu çalışma için yazışmadan sorumlu yazar
  • Istanbul Technical University
  • Tinsa Co.

Araştırma sonucu: Uzmanlık yayınına katkıMakale

12 Atıf (Scopus)

Özet

The Tarabya tunnel forms a major part of a sewerage project currently under construction in Istanbul, Turkey, designed to clean up the unacceptable pollution present in the Istinye - Tarabya and Büyükdere bay areas of the city's Bosphorus River. The tunnel is 13,270m long with an i.d. of 2m and is situated between Sariyer in the north and Baltalimani in south. Some limestone samples were taken form the tunnel face in September and November 2000 for testing in the laboratory. These were thought to be representative of the geology along the majority of the alignment and were subjected to full-scale laboratory cutting tests using one of the TBMs disc cutters. The relationship between thrust force and depth of cut recorded in the lab was compared to those obtained in the field to assist future research into machine utilization. The compressive strengths of the samples were found to be 80±7MPa and 119±16MPa respectively.

Orijinal dilİngilizce
Sayfalar17-19
Sayfa sayısı3
Hacim38
Hayır2
Uzman yayınıTunnels and Tunnelling International
Yayın durumuYayınlandı - Şub 2006

BM SKH

Bu sonuç, aşağıdaki Sürdürülebilir Kalkınma Hedefine/Hedeflerine katkıda bulunur

  1. SKH 11 - Sürdürülebilir Şehirler ve Topluluklar
    SKH 11 Sürdürülebilir Şehirler ve Topluluklar

Parmak izi

TBM cutting performance in Istanbul' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Alıntı Yap