Ana gezinime geç Aramaya geç Ana içeriğe geç

Semi-online two-level supply chain scheduling problems

  • Igor Averbakh*
  • , Mehmet Baysan
  • *Bu çalışma için yazışmadan sorumlu yazar
  • University of Toronto

Araştırma sonucu: Dergiye katkıMakalebilirkişi

18 Atıf (Scopus)

Özet

We consider two-level supply chain scheduling problems where customers release jobs to a manufacturer that has to process the jobs and deliver them to the customers. Processed jobs are grouped into batches, which are delivered to the customers as single shipments. The objective is to minimize the total cost which is the sum of the total flow time and the total delivery cost. Such problems have been considered in the off-line environment where future jobs are known, and in the online environment where at any time there is no information about future jobs. It is known that the best possible competitive ratio for an online algorithm is 2. We consider the problem in the semi-online environment, assuming that a lower bound P for all processing times is available a priori, and present a semi-online algorithm with competitive ratio 2D/D+p where D is the cost of a delivery. Also, for the special case where all processing times are equal, we prove that the algorithm is 1.045,√2-u/u competitive, where u is the density of the instance.

Orijinal dilİngilizce
Sayfa (başlangıç-bitiş)381-390
Sayfa sayısı10
DergiJournal of Scheduling
Hacim15
Basın numarası3
DOI'lar
Yayın durumuYayınlandı - Haz 2012
Harici olarak yayınlandıEvet

Finansman

Acknowledgements This work was supported by a grant from the Natural Sciences and Engineering Research Council of Canada (NSERC) to Igor Averbakh.

Finansörler
Natural Sciences and Engineering Research Council of Canada

    Parmak izi

    Semi-online two-level supply chain scheduling problems' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

    Alıntı Yap