Ana gezinime geç Aramaya geç Ana içeriğe geç

Scheduling batches in multi hybrid cell manufacturing system considering worker resources: A case study from pipeline industry

  • O. F. Yilmaz*
  • , E. Cevikcan
  • , M. B. Durmusoglu
  • *Bu çalışma için yazışmadan sorumlu yazar

Araştırma sonucu: Dergiye katkıMakalebilirkişi

22 Atıf (Scopus)

Özet

This study considers batch scheduling problem in the multi hybrid cell manufacturing system (MHCMS) taking into account worker resources. This problem consists of determining sequence of batches, finding the starting time of each batch, and assigning workers to the batches in accordance with some pre-determined objectives. Due to a lack of studies on the batch scheduling problem in the MHCMS, a binary integer linear goal programming mathematical model is developed for bi-objective batch scheduling problem in this study. The formulated model is difficult to solve for large sized problem instances. To solve the model, we develop an efficient heuristic method called the Hybrid Cells Batch Scheduling (HCBS) heuristic. The proposed HCBS heuristic permits integrating batch scheduling and employee (worker) timetabling. Furthermore, we construct upper and lower bounds for the average flow time and the total number of workers. For evaluation of the performance of the heuristic, computational experiments are performed on generated test instances based on real production data. Results of the experiments show that the suggested heuristic method is capable of solving large sized problem instances in a reasonable amount of CPU time.

Orijinal dilİngilizce
Sayfa (başlangıç-bitiş)192-206
Sayfa sayısı15
DergiAdvances in Production Engineering And Management
Hacim11
Basın numarası3
DOI'lar
Yayın durumuYayınlandı - Eyl 2016

Bibliyografik not

Publisher Copyright:
© 2016 PEI, University of Maribor. All rights reserved.

BM SKH

Bu sonuç, aşağıdaki Sürdürülebilir Kalkınma Hedefine/Hedeflerine katkıda bulunur

  1. SKH 9 - Sanayi, Yenilikçilik ve Altyapı
    SKH 9 Sanayi, Yenilikçilik ve Altyapı

Parmak izi

Scheduling batches in multi hybrid cell manufacturing system considering worker resources: A case study from pipeline industry' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Alıntı Yap