Scheduling asphalt highway construction operations using the combination of line-of-balance and discrete event simulation techniques

G. Polat*, Y. Buyuksaracoglu, A. Damci

*Bu çalışma için yazışmadan sorumlu yazar

Araştırma sonucu: Kitap/Rapor/Konferans Bildirisinde BölümKonferans katkısıbilirkişi

6 Atıf (Scopus)

Özet

Linear construction projects typically consist of several repetitive activities and have the same operations repeated at each unit. Traditional scheduling techniques are found to be inadequate to solve scheduling problems of such projects. Linear scheduling methods are well suited to the characteristics of linear construction projects. Line-of-Balance is one of these linear scheduling methods. Asphalt highway construction project may be a good example for a linear project. The main objective of this study is to handle the scheduling problem of both on-site and off-site operations of a 4 km long and 14 m wide asphalt highway project using the combination of line-of-balance and discrete event simulation techniques. It is found that the studied project could be completed within at least 17 days using the resources owned by the contractor company. Moreover, the developed simulation model enables the contractor to estimate the arrival times of the trucks that would provide an uninterrupted work flow.

Orijinal dilİngilizce
Ana bilgisayar yayını başlığıIEEM 2009 - IEEE International Conference on Industrial Engineering and Engineering Management
Sayfalar1126-1130
Sayfa sayısı5
DOI'lar
Yayın durumuYayınlandı - 2009
EtkinlikIEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2009 - Hong Kong, China
Süre: 8 Ara 200911 Ara 2009

Yayın serisi

AdıIEEM 2009 - IEEE International Conference on Industrial Engineering and Engineering Management

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2009
Ülke/BölgeChina
ŞehirHong Kong
Periyot8/12/0911/12/09

Parmak izi

Scheduling asphalt highway construction operations using the combination of line-of-balance and discrete event simulation techniques' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Alıntı Yap