Schedule risk assessment in green building projects

Asli Pelin Gurgun, Hasan Gokberk Bayhan, Gul Polat, Harun Turkoglu

Araştırma sonucu: Dergiye katkıKonferans makalesibilirkişi

5 Atıf (Scopus)

Özet

Construction projects are subjected to a variety of risks eventually affecting the overall duration and green building projects are no exception. Use of risk assessment means in such projects is also critical to complete them within aimed schedule. In this study, risks that have potential schedule impacts in certified green building projects are identified and their impact and likelihood of occurrence values are researched. For this purpose, a survey is administered to construction professionals with green building experience. Based on the responses, risks are plotted to draw their potential impact on schedule/likelihood of occurrence in a graph to identify the most significant risk factors. This tool may help the practitioners to identify and prioritize potential risks and allocate resources in projects accordingly to prevent or minimize their possible impacts.

Orijinal dilİngilizce
Makale numarasıSUS-13
DergiProceedings of International Structural Engineering and Construction
Hacim5
Basın numarası1
DOI'lar
Yayın durumuYayınlandı - 2018
Etkinlik2nd European and Mediterranean Structural Engineering and Construction Conference, EURO-MED-SEC-2 2018 - Beirut, Lebanon
Süre: 23 Tem 201828 Tem 2018

Bibliyografik not

Publisher Copyright:
© 2018 ISEC Press.

Parmak izi

Schedule risk assessment in green building projects' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Alıntı Yap