Real time reactor noise diagnostics for the Borssele (PWR) nuclear power plant

B. Barutçu*, S. Şeker, E. Ayaz, E. Türkcan

*Bu çalışma için yazışmadan sorumlu yazar

Araştırma sonucu: Dergiye katkıMakalebilirkişi

10 Atıf (Scopus)

Özet

After the upgrade of Borssele NPP in 1997, core cycle 24, the power plant operated three years more with 91% availability. The authority of the power plant decided to enhance and upgrade the reactor trend monitoring and plant information recording system with higher frequencies than the plant data processing system (PPS) as well as installing a flexible and multiple-purpose reactor noise analysis system which may support the reactor maintenance group with, on-line and off-line capabilities for several different signal processing applications. Two measuring and monitoring systems were built in 2001 and fully taken in implementation during the start-up of the new core 28. In this sense, the new system was used in power operation during the 29th of September 2001. This paper will introduce the measuring system, the operational tasks, and the results obtained so far on the real-time core-barrel motions (CBM) and the two-primary coolant pump vibrations measured through the reactor noise analysis.

Orijinal dilİngilizce
Sayfa (başlangıç-bitiş)137-143
Sayfa sayısı7
DergiProgress in Nuclear Energy
Hacim43
Basın numarası1-4 SPEC
DOI'lar
Yayın durumuYayınlandı - 2003

Parmak izi

Real time reactor noise diagnostics for the Borssele (PWR) nuclear power plant' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Alıntı Yap