Project scheduling to maximize fuzzy net present value

Irem Uçal*, Dorota Kuchta

*Bu çalışma için yazışmadan sorumlu yazar

Araştırma sonucu: ???type-name???Konferans katkısıbilirkişi

7 Atıf (Scopus)

Özet

In this paper a fuzzy version of a procedure for project scheduling is proposed to maximize the fuzzy net present value of projects with fuzzy cash flows. Fuzzy equivalents of cash flow weight and discounted cash flow weight are defined which are used to find the importance of the activities with respect to the fuzzy net present value of the project. The procedure is applied to an example and results are discussed in conclusions.

Orijinal dilİngilizce
Ana bilgisayar yayını başlığıProceedings of the World Congress on Engineering 2011, WCE 2011
Sayfalar1184-1189
Sayfa sayısı6
Yayın durumuYayınlandı - 2011
EtkinlikWorld Congress on Engineering 2011, WCE 2011 - London, United Kingdom
Süre: 6 Tem 20118 Tem 2011

Yayın serisi

AdıProceedings of the World Congress on Engineering 2011, WCE 2011
Hacim2

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???World Congress on Engineering 2011, WCE 2011
Ülke/BölgeUnited Kingdom
ŞehirLondon
Periyot6/07/118/07/11

Parmak izi

Project scheduling to maximize fuzzy net present value' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Alıntı Yap