Özet
Evaluation of the industrial pretreatment plants in Istanbul Metropolitan area is presented. Out of 7899 industries located in Istanbul, 1420 of them require pretreatment to meet the discharge criteria. Currently, there are 532 pretreatment works which treat 82.6 percent of the industrial wastewaters. Discharge standards and the compliance monitoring system for the industrial wastewater discharges into the public sewers as applied by the Istanbul Water and Sewerage Administration are discussed. The performance data of the pretreatment plants are given based on the percent non-compliance and percent removal efficiency figures determined for different categories of industry. Problem areas in terms of industrial sector and in terms of quality parameters are identified.
| Orijinal dil | İngilizce |
|---|---|
| Sayfa (başlangıç-bitiş) | 101-107 |
| Sayfa sayısı | 7 |
| Dergi | Water Science and Technology |
| Hacim | 36 |
| Basın numarası | 2-3 |
| DOI'lar | |
| Yayın durumu | Yayınlandı - 1997 |
| Etkinlik | Proceedings of the 1996 2nd IAWQ International Conference on Pretreatment of Industrial Wastewaters - Athens, Greece Süre: 16 Eki 1996 → 18 Eki 1996 |
BM SKH
Bu sonuç, aşağıdaki Sürdürülebilir Kalkınma Hedefine/Hedeflerine katkıda bulunur
-
SKH 6 Temiz Su ve Sanitasyon
-
SKH 12 Sorumlu Üretim ve Tüketim
Parmak izi
Pretreatment requirements and status of industrial effluents in the greater Istanbul area' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.Alıntı Yap
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver