Özet
A lab-scale granular sludge sequencing batch reactor (G-SBR) system was operated using synthetic wastewater. The total nitrogen removal efficiency of 85% was obtained together with the achievement of complete total phosphorus removal with average granule diameter of 400 µm. Dual-step nitrification and denitrification model with fixed biofilm thickness was used for performance analysis. The denitrification mode only contributed to TN removal with 25% which can be calculated with process stoichiometry. The remaining nitrogen removal could be explained by simulating simultaneous nitrification and denitrification which was responsible for 75% denitrification during aerobic period. In addition, low NO3− concentration at the beginning of the fill period provided advantage for securing a prolonged anaerobic period for enhanced biological phosphorus removal (EBPR). The model parameters of boundary layer thickness (z BL = 50 µm) and half-saturation of O2 for nitrite-oxidizing bacteria (K O2,NOB = 0.5 gO2/m3) were tuned to fit NO2 and NO3 profiles in SBR cycle. Graphical Abstract: [Figure not available: see fulltext.].
Orijinal dil | İngilizce |
---|---|
Sayfa (başlangıç-bitiş) | 124780-124789 |
Sayfa sayısı | 10 |
Dergi | Environmental Science and Pollution Research |
Hacim | 30 |
Basın numarası | 60 |
DOI'lar | |
Yayın durumu | Yayınlandı - Ara 2023 |
Bibliyografik not
Publisher Copyright:© 2023, The Author(s), under exclusive licence to Springer-Verlag GmbH Germany, part of Springer Nature.
Finansman
This work was funded by The Scientific and Technological Research Council of Turkey, TUBITAK (Project No: 107Y137), and the Research Foundation of Istanbul University (Project No: 613/15122006).
Finansörler | Finansör numarası |
---|---|
Istanbul Üniversitesi | 613/15122006 |
Türkiye Bilimsel ve Teknolojik Araştırma Kurumu | 107Y137 |