Özet
A Study for the Optimization of Construction and Operation Costs for Metro Systems This article makes a brief reference to the Ph.D. dissertation by the author. Developing an approach method for, calculating and offering the most appropriate solution to optimize a metro system's construction and operation costs. This includes different alternatives for passenger capacity, train sets, construction methods, etc. In order to optimize the construction and operation costs of a metro line, a software was developed in Microsoft Visual Studio with C# language by using object oriented programming approach. The software uses Big Bang-Big Crunch (BB-BC) algorithm for the optimization process. BB- BC Genetic Algorithm method and results of the Simulator X were used for the optimization. Finally the study also aims to offer a proposed software model which must meet the estimated transport demand for the target year, and also satisfies minimum construction and operating costs, with alternatives.
| Orijinal dil | Türkçe |
|---|---|
| Sayfa (başlangıç-bitiş) | 7659-7668 |
| Sayfa sayısı | 10 |
| Dergi | Teknik Dergi/Technical Journal of Turkish Chamber of Civil Engineers |
| Hacim | 27 |
| Basın numarası | 4 |
| Yayın durumu | Yayınlandı - 2016 |
BM SKH
Bu sonuç, aşağıdaki Sürdürülebilir Kalkınma Hedefine/Hedeflerine katkıda bulunur
-
SKH 11 Sürdürülebilir Şehirler ve Topluluklar
Keywords
- Construction costs
- Metro
- Operating costs
- Optimization
Alıntı Yap
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver