Ana gezinime geç Aramaya geç Ana içeriğe geç

Fatigue life evaluation of a through-girder steel railway bridge

  • Istanbul Technical University

Araştırma sonucu: Dergiye katkıMakalebilirkişi

31 Atıf (Scopus)

Özet

Over the recent years, the Marmaray project has come into realization in Istanbul in order to connect the two continents, Europe and Asia, by providing an underwater link for the first time. Some existing steel railway bridges will also be used for the proposed railway infrastructure. The purpose of this study is to identify the factors affecting the remaining effective service life of such a bridge, and possible fatigue life extension. Firstly, the whole structure was inspected visually for any existing damage due to highway traffic passing underneath. Detailed field measurements and in-depth analytical studies were conducted to determine the axle loads and bridge responses under current operating conditions. A statistical description of typical train cars was developed. Using the computer model which was refined by field measurements, the bridge was re-assessed according to expected train traffic for the future. The results were then used to determine the remaining life of the steel railway bridge. In order to improve the fatigue life, a strengthening scheme to extend the service life has been proposed for a typical bridge component.

Orijinal dilİngilizce
Sayfa (başlangıç-bitiş)765-774
Sayfa sayısı10
DergiEngineering Failure Analysis
Hacim16
Basın numarası3
DOI'lar
Yayın durumuYayınlandı - Nis 2009

BM SKH

Bu sonuç, aşağıdaki Sürdürülebilir Kalkınma Hedefine/Hedeflerine katkıda bulunur

  1. SKH 9 - Sanayi, Yenilikçilik ve Altyapı
    SKH 9 Sanayi, Yenilikçilik ve Altyapı
  2. SKH 11 - Sürdürülebilir Şehirler ve Topluluklar
    SKH 11 Sürdürülebilir Şehirler ve Topluluklar

Parmak izi

Fatigue life evaluation of a through-girder steel railway bridge' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Alıntı Yap