Özet
Modern metro lines deploy Communication-Based Train Control (CBTC), which uses moving block that allows shorter headway times. Maximum operation speed, traction package's delays and reaction times, guaranteed emergency brake rate (GEBR), track gradients, and switch locations affect the headway time. This paper focuses on the GEBR (from 0.6 to 1.1 m/s2) and track gradient values' (±4.0% with 0.5 steps) effect on the headway time. One hundred two combinations of both parameters are used in simulations carried out with Hi-SimuX Rail Simulation Suite, which can calculate safe braking distance as per IEEE standards. The paper quantifies the effects of the GEBR and the gradient values on the achieved headway time on a metro line that shows that GEBR, gradient, GEBRGradient might affect the headway respectively up to 43.83%, 43.17%, 51.5%. Also, a formula was produced defining the relationship between headway time, the GEBR, and gradient values.
Orijinal dil | İngilizce |
---|---|
Ana bilgisayar yayını başlığı | 2021 13th International Conference on Electrical and Electronics Engineering, ELECO 2021 |
Yayınlayan | Institute of Electrical and Electronics Engineers Inc. |
Sayfalar | 52-56 |
Sayfa sayısı | 5 |
ISBN (Elektronik) | 9786050114379 |
DOI'lar | |
Yayın durumu | Yayınlandı - 2021 |
Etkinlik | 13th International Conference on Electrical and Electronics Engineering, ELECO 2021 - Virtual, Bursa, Turkey Süre: 25 Kas 2021 → 27 Kas 2021 |
Yayın serisi
Adı | 2021 13th International Conference on Electrical and Electronics Engineering, ELECO 2021 |
---|
???event.eventtypes.event.conference???
???event.eventtypes.event.conference??? | 13th International Conference on Electrical and Electronics Engineering, ELECO 2021 |
---|---|
Ülke/Bölge | Turkey |
Şehir | Virtual, Bursa |
Periyot | 25/11/21 → 27/11/21 |
Bibliyografik not
Publisher Copyright:© 2021 Chamber of Turkish Electrical Engineers.
Finansman
The authors would like to thank HI-SIM Technology Engineering Industry and Trade Limited Corporation for sponsoring this research.