TY - JOUR
T1 - Developing criteria for advanced exergoeconomic performance analysis of thermal energy systems
T2 - Application to a marine steam power plant
AU - Koroglu, Turgay
AU - Sogut, Oguz Salim
N1 - Publisher Copyright:
© 2023 Elsevier Ltd
PY - 2023/3/15
Y1 - 2023/3/15
N2 - Advanced exergoeconomic analysis is a powerful tool to evaluate the economic improvement potential of a system, but it lacks providing information on the required investments to be made to improve the system and its components while considering cost-benefit assessments. In this paper novel criteria are introduced as an extension to fulfill the shortcomings of mentioned analysis and provide further insight about investment feasibility of components as well as the whole system including but not limited to the amount of avoided exergy destruction per unit renovating cost, the renovating cost to improve the efficiency, the amount of profit after renovation. The criteria are applied to a marine steam power plant to evaluate the system and its components. The results show that boiler has the highest avoidable exergy destruction cost of 77.4 $/h while the third stage of low-pressure turbine (LPT3) has the highest recovered exergy destruction per dollar invested. On the other hand, by investing in boiler, the saving potential is 36.8 $/h and on LPT3 it is 6.5$/h. It has been observed that the overall system has avoidable exergy destruction cost of 101$/h, while a 52.7 $/h part of it could be saved with the improvement investments made.
AB - Advanced exergoeconomic analysis is a powerful tool to evaluate the economic improvement potential of a system, but it lacks providing information on the required investments to be made to improve the system and its components while considering cost-benefit assessments. In this paper novel criteria are introduced as an extension to fulfill the shortcomings of mentioned analysis and provide further insight about investment feasibility of components as well as the whole system including but not limited to the amount of avoided exergy destruction per unit renovating cost, the renovating cost to improve the efficiency, the amount of profit after renovation. The criteria are applied to a marine steam power plant to evaluate the system and its components. The results show that boiler has the highest avoidable exergy destruction cost of 77.4 $/h while the third stage of low-pressure turbine (LPT3) has the highest recovered exergy destruction per dollar invested. On the other hand, by investing in boiler, the saving potential is 36.8 $/h and on LPT3 it is 6.5$/h. It has been observed that the overall system has avoidable exergy destruction cost of 101$/h, while a 52.7 $/h part of it could be saved with the improvement investments made.
KW - Advanced exergoeconomic analysis
KW - Advanced exergoeconomic performance criteria
KW - Energy systems
KW - Exergy based evaluation
KW - Marine power plant
UR - http://www.scopus.com/inward/record.url?scp=85145729419&partnerID=8YFLogxK
U2 - 10.1016/j.energy.2022.126582
DO - 10.1016/j.energy.2022.126582
M3 - Article
AN - SCOPUS:85145729419
SN - 0360-5442
VL - 267
JO - Energy
JF - Energy
M1 - 126582
ER -