Özet
One very important aspect of mining is deciding what material in a deposit is worth mining and processing, versus what material should be considered waste. This decision is summarized by the cut-off grade policy. The cut-off grade strategy for an open pit mine influences the annual cash flows and affects the net present value of a project. The optimization of cut-off grade strategy requires the knowledge of detailed operational costs, mining sequence, mining operation, processing, and product constraints, as well as the grade distribution of a given deposit defined by pit, phase, and different material types. Cut-off grade optimization algorithms have been developed in the past The most common criteria used in cut-off grade optimization is to maximize the net present value (NPV). This paper describes the determination of a cut-off grade strategy based on Lane's algorithm adding an optimization factor based on the generalized reduced gradient (CRC) algorithm to maximize the project's NPV. The introduced algorithm is a windows based program developed at Virginia Tech that is based on a series of Visual Basic routines within a spreadsheet environment (Excel). The benefits of the methodology are demonstrated using a hypothetical case study.
| Orijinal dil | İngilizce |
|---|---|
| Sayfa (başlangıç-bitiş) | 87-94 |
| Sayfa sayısı | 8 |
| Dergi | Journal of the Southern African Institute of Mining and Metallurgy |
| Hacim | 107 |
| Basın numarası | 2 |
| Yayın durumu | Yayınlandı - Şub 2007 |
| Harici olarak yayınlandı | Evet |
Parmak izi
Determination of optimal cut-off grade policy to optimize NPV using a new approach with optimization factor' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.Alıntı Yap
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver