Crashing construction projects considering schedule flexibility: an illustrative example

Harun Turkoglu, Gul Polat*, Firat Dogu Akin

*Bu çalışma için yazışmadan sorumlu yazar

Araştırma sonucu: Dergiye katkıMakalebilirkişi

4 Atıf (Scopus)

Özet

Time and cost are two of the most important performance indicators of construction projects. Project crashing is one of the effective methods for solving time-cost trade-off problems. However, in some instances, consuming all of the crash durations of the activities may lead to inflexible schedules. This paper proposes a project crashing model that aims to achieve more flexible schedules by means of assigning a crash duration consumption rate to each activity based on the preferred scheduling strategy. The applicability of the proposed model is presented along with an illustrative example. The Monte Carlo simulation is also performed to verify whether the proposed model is useful or not. The results revealed that the proposed model is an effective tool as it maintains schedule flexibility and increases the probability of completing the project in the targeted project duration. The proposed model also provides a new perspective for schedulers to solve project crashing problems.

Orijinal dilİngilizce
Sayfa (başlangıç-bitiş)619-628
Sayfa sayısı10
DergiInternational Journal of Construction Management
Hacim23
Basın numarası4
DOI'lar
Yayın durumuYayınlandı - 2023

Bibliyografik not

Publisher Copyright:
© 2021 Informa UK Limited, trading as Taylor & Francis Group.

Parmak izi

Crashing construction projects considering schedule flexibility: an illustrative example' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Alıntı Yap