Özet
Transformers are important components of power systems. This study compares the costs associated with different parts of the transformer. The cost of different components in a power transformer can vary greatly depending on many factors, such as transformer size, capacity, power rating, construction materials, and manufacturing. Factors such as transformer core, windings, insulation, cooling systems, labor costs, and other equipment are all considered. The goal of this study is to compare the prices of various products and analyze the economic factors influencing transformer production and design. Understanding these costs is important for increasing competitiveness in the transformer industry. This work enables transformer manufacturers to identify the cost ratio of the different parts and potential cost-optimization opportunities.
| Orijinal dil | İngilizce |
|---|---|
| Ana bilgisayar yayını başlığı | Proceedings - ELTICOM 2024 |
| Ana bilgisayar yayını alt yazısı | 8th International Conference on Electrical, Telecommunication and Computer Engineering: Tech-Driven Innovations for Global Organizational Resilience |
| Yayınlayan | Institute of Electrical and Electronics Engineers Inc. |
| Sayfalar | 303-307 |
| Sayfa sayısı | 5 |
| ISBN (Elektronik) | 9798331531249 |
| DOI'lar | |
| Yayın durumu | Yayınlandı - 2024 |
| Etkinlik | 8th International Conference on Electrical, Telecommunication and Computer Engineering, ELTICOM 2024 - Medan, Indonesia Süre: 21 Kas 2024 → 22 Kas 2024 |
Yayın serisi
| Adı | Proceedings - ELTICOM 2024: 8th International Conference on Electrical, Telecommunication and Computer Engineering: Tech-Driven Innovations for Global Organizational Resilience |
|---|
???event.eventtypes.event.conference???
| ???event.eventtypes.event.conference??? | 8th International Conference on Electrical, Telecommunication and Computer Engineering, ELTICOM 2024 |
|---|---|
| Ülke/Bölge | Indonesia |
| Şehir | Medan |
| Periyot | 21/11/24 → 22/11/24 |
Bibliyografik not
Publisher Copyright:© 2024 IEEE.
BM SKH
Bu sonuç, aşağıdaki Sürdürülebilir Kalkınma Hedefine/Hedeflerine katkıda bulunur
-
SKH 9 Sanayi, Yenilikçilik ve Altyapı
Parmak izi
Cost Analysis and Economic Factors in Transformer Design and Production' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.Alıntı Yap
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver