Ana gezinime geç Aramaya geç Ana içeriğe geç

Commentary on 'Construction projects selection and risk assessment by Fuzzy AHP and Fuzzy TOPSIS methodologies' [Applied Soft Computing 17 (2014): 105-116]

  • Osman Taylan*
  • , Mohammed R. Kabli
  • , Mahdi Saeedpoor
  • , Amin Vafadarnikjoo
  • *Bu çalışma için yazışmadan sorumlu yazar

Araştırma sonucu: Dergiye katkıYorum/tartışma

20 Atıf (Scopus)

Özet

Taylan et al. [2014]. Construction projects selection and risk assessment by Fuzzy AHP and Fuzzy TOPSIS methodologies' [Applied Soft Computing 17, 105-116] aimed at using novel analytic tools to assess the construction projects and their total risks under inexact and imprecise situations. They applied Fuzzy Analytic Hierarchy Process (Fuzzy AHP) to create appropriate weights for five main criteria i.e. time, cost, quality, safety, and environmental sustainability and then Fuzzy Technique for Order of Preference by Similarity to Ideal Solution (Fuzzy TOPSIS) to rank the 30 construction projects on the basis of the opinions of seven decision makers in various sectors in Saudi Arabia. In this work, some inaccuracies of this recently published article are shown and corrected.

Orijinal dilİngilizce
Sayfa (başlangıç-bitiş)419-421
Sayfa sayısı3
DergiApplied Soft Computing
Hacim36
DOI'lar
Yayın durumuYayınlandı - 17 Ağu 2015
Harici olarak yayınlandıEvet

Bibliyografik not

Publisher Copyright:
© 2015 Elsevier B.V. All rights reserved.

BM SKH

Bu sonuç, aşağıdaki Sürdürülebilir Kalkınma Hedefine/Hedeflerine katkıda bulunur

  1. SKH 17 - Hedefler için Ortaklıklar
    SKH 17 Hedefler için Ortaklıklar

Parmak izi

Commentary on 'Construction projects selection and risk assessment by Fuzzy AHP and Fuzzy TOPSIS methodologies' [Applied Soft Computing 17 (2014): 105-116]' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Alıntı Yap