Challenges in line-of-balance scheduling

David Arditi*, Onur B. Tokdemir, Kangsuk Suh

*Bu çalışma için yazışmadan sorumlu yazar

Araştırma sonucu: ???type-name???Makalebilirkişi

118 Atıf (Scopus)

Özet

The line-of-balance (LOB) method of scheduling is well suited to projects that are composed of activities of a linear and repetitive nature. The objective of this study is to set down the basic principles that can be used in the development of a computerized LOB scheduling system that overcomes the problems associated with existing systems and creates solutions to problems encountered in the implementation of repetitive-unit construction. The challenges associated with LOB scheduling include developing an algorithm that handles project acceleration efficiently and accurately, recognizing time and space dependencies, calculating LOB quantities, dealing with resource and milestone constraints, incorporating the occasional nonlinear and discrete activities, defining a radically new concept of criticalness, including the effect of the learning curve, developing an optimal strategy to reduce project duration by increasing the rate of production of selected activities, performing cost optimization, and improving the visual presentation of LOB diagrams.

Orijinal dilİngilizce
Sayfa (başlangıç-bitiş)545-556
Sayfa sayısı12
DergiJournal of Construction Engineering and Management - ASCE
Hacim128
Basın numarası6
DOI'lar
Yayın durumuYayınlandı - Kas 2002
Harici olarak yayınlandıEvet