This paper presents big bang-big crunch (BB-BC) method for the optimization of preventive control action to enhance the dynamic security of the power system against transient instabilities. In the proposed approach, generation rescheduling is selected as a preventive control action and this control action is considered as a constrained optimization problems where the constraints are dynamic security of the system, generation limits and loading capabilities of transmission lines. The security constrained generation rescheduling is implemented through BB-BC method which optimizes the total fuel cost during the preventive control. The proposed method is applied to 50 generator 145 bus IEEE test system and the effectiveness of the approach is discussed.

Orijinal dilİngilizce
Ana bilgisayar yayını başlığı2012 3rd IEEE PES Innovative Smart Grid Technologies Europe, ISGT Europe 2012
DOI'lar
Yayın durumuYayınlandı - 2012
Etkinlik2012 3rd IEEE PES Innovative Smart Grid Technologies Europe, ISGT Europe 2012 - Berlin, Germany
Süre: 14 Eki 201217 Eki 2012

Yayın serisi

AdıIEEE PES Innovative Smart Grid Technologies Conference Europe

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???2012 3rd IEEE PES Innovative Smart Grid Technologies Europe, ISGT Europe 2012
Ülke/BölgeGermany
ŞehirBerlin
Periyot14/10/1217/10/12

Parmak izi

Big bang-big crunch based optimal preventive control action on power systems' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Alıntı Yap