Özet
A manufacturer has to process jobs released on-line and deliver them to customers. Preemption is allowed. Jobs are grouped into batches for delivery. The sum of the total flow time and the total delivery cost is minimized. Deliveries to different customers cannot be combined. We present an on-line algorithm with the competitive ratio bounded by 3+α, where α is the ratio of the largest processing time to the smallest processing time.
| Orijinal dil | İngilizce |
|---|---|
| Sayfa (başlangıç-bitiş) | 710-714 |
| Sayfa sayısı | 5 |
| Dergi | Operations Research Letters |
| Hacim | 41 |
| Basın numarası | 6 |
| DOI'lar | |
| Yayın durumu | Yayınlandı - 2013 |
| Harici olarak yayınlandı | Evet |
Finansman
This work was supported by a grant from the Natural Sciences and Engineering Research Council of Canada (NSERC) to the first author.
| Finansörler |
|---|
| Natural Sciences and Engineering Research Council of Canada |
Parmak izi
Approximation algorithm for the on-line multi-customer two-level supply chain scheduling problem' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.Alıntı Yap