Ana gezinime geç Aramaya geç Ana içeriğe geç

Analysis of HDPE pipe-compacted soil interaction

  • D. V. Reddy*
  • , C. Gazagnaire
  • , S. Ataoglu
  • , R. Powers
  • *Bu çalışma için yazışmadan sorumlu yazar

Araştırma sonucu: Konferansa katkıYazıbilirkişi

4 Atıf (Scopus)

Özet

The primary goal of this study was to evaluate the service life of buried HDPE (High density polyethylene) notched/un-notched pipes. The performance of notched and un-notched buried pipes subjected to live loading was studied in soil chambers for three levels of service loading. The long-term behavior was accelerated with super-ambient temperatures. Strains and diametral changes were measured for 10,000 hours. Extrapolation of the long-term performance at ambient temperature, based on the Bi-directional and the Arrhenius methods, showed that the deflection threshold (7.5% vertical change of diameter) as the governing failure condition, and similar life predictions for Bi-directional and Arrhenius methods, with service lives of approximately 30 and 80 years at ambient temperature, for the notched and un-notched pipes, respectively.

Orijinal dilİngilizce
Sayfalar494-505
Sayfa sayısı12
Yayın durumuYayınlandı - 2001
Harici olarak yayınlandıEvet
Etkinlik33rd International SAMPE Technical Conference -Advancing Affordable Materials Technology- - Seattle, WA, United States
Süre: 5 Kas 20018 Kas 2001

???event.eventtypes.event.conference???

???event.eventtypes.event.conference???33rd International SAMPE Technical Conference -Advancing Affordable Materials Technology-
Ülke/BölgeUnited States
ŞehirSeattle, WA
Periyot5/11/018/11/01

Parmak izi

Analysis of HDPE pipe-compacted soil interaction' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Alıntı Yap