T1 - An integrative literature review on the causes of delays in construction projects
T2 - evidence from developing countries
AU - Selcuk, Onur
AU - Turkoglu, Harun
AU - Polat, Gul
AU - Hajdu, Miklós
N1 - Publisher Copyright:
© 2022 Informa UK Limited, trading as Taylor & Francis Group.
PY - 2024
Y1 - 2024
N2 - Delays have commonly been a serious problem. This study aims to evaluate, criticize, and synthesize the literature on the causes of delays in construction. A total of 70 journal articles from 33 countries focussing on identifying the causes of delays were critically analysed. The main findings of this study are that the questionnaire survey is the most commonly used data collection method, the project phases at which the causes of delays are identified is not clearly stated in the majority of the reviewed articles, there is no agreement on the classification of causes of delays, the number of causes of delays studied by researchers greatly varies, the term ‘delay’ is not clearly defined in the majority of the articles, there is no standardized terminology for the causes of delays, key variables such as type of project, project delivery system and contract type are mostly ignored, and the location of the project is an important variable to consider when identifying the causes of delays. The findings of this study provide researchers, practitioners, and construction professionals with a detailed reference, which can assist them in better understanding the causes of delays, taking the necessary proactive actions, and improving the overall project performance.
AB - Delays have commonly been a serious problem. This study aims to evaluate, criticize, and synthesize the literature on the causes of delays in construction. A total of 70 journal articles from 33 countries focussing on identifying the causes of delays were critically analysed. The main findings of this study are that the questionnaire survey is the most commonly used data collection method, the project phases at which the causes of delays are identified is not clearly stated in the majority of the reviewed articles, there is no agreement on the classification of causes of delays, the number of causes of delays studied by researchers greatly varies, the term ‘delay’ is not clearly defined in the majority of the articles, there is no standardized terminology for the causes of delays, key variables such as type of project, project delivery system and contract type are mostly ignored, and the location of the project is an important variable to consider when identifying the causes of delays. The findings of this study provide researchers, practitioners, and construction professionals with a detailed reference, which can assist them in better understanding the causes of delays, taking the necessary proactive actions, and improving the overall project performance.
KW - Causes of delays
KW - construction
KW - delays
KW - developing countries
KW - integrative review
KW - time overrun
UR - http://www.scopus.com/inward/record.url?scp=85141571811&partnerID=8YFLogxK
U2 - 10.1080/15623599.2022.2135939
DO - 10.1080/15623599.2022.2135939
M3 - Article
AN - SCOPUS:85141571811
SN - 1562-3599
VL - 24
SP - 610
EP - 622
JO - International Journal of Construction Management
JF - International Journal of Construction Management
IS - 6
ER -