A pre-feasibility case study on integrated resource planning including renewables

Pelin Yilmaz, M. Hakan Hocaoglu, Alp Er S. Konukman*

*Bu çalışma için yazışmadan sorumlu yazar

Araştırma sonucu: Dergiye katkıMakalebilirkişi

36 Atıf (Scopus)

Özet

In recent years, economical and environmental constraints force governments and energy policy decision-makers to change the prominent characteristics of the electricity markets. Accordingly, depending on local conditions on the demand side, usage of integrated resource planning approaches in conjunction with renewable technologies has gained more importance. In this respect, an integrated resource planning option, which includes the design and optimization of grid-connected renewable energy plants, should be evaluated to facilitate a cost-effective and green solution to a sustainable future. In this paper, an integrated resource planning case is studied for an educational campus, located in Gebze, Turkey. It is found that for the considered campus, the integrated resource planning scenario that includes renewables as a supply-side option with existing time-of-use tariff may provide a cost-effective energy production, particularly for the high penetration level of the renewables.

Orijinal dilİngilizce
Sayfa (başlangıç-bitiş)1223-1232
Sayfa sayısı10
DergiEnergy Policy
Hacim36
Basın numarası3
DOI'lar
Yayın durumuYayınlandı - Mar 2008

Parmak izi

A pre-feasibility case study on integrated resource planning including renewables' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Alıntı Yap