A New Extended MILP MRP Approach to Production Planning and Its Application in the Jewelry Industry

  • Erhan Yazici*
  • , Gülçin Büyüközkan
  • , Murat Baskak
  • *Bu çalışma için yazışmadan sorumlu yazar
  • Istanbul Technical University
  • Galatasaray University

Araştırma sonucu: Dergiye katkıMakalebilirkişi

10 Atıf (Scopus)

Özet

It is important to manage reverse material flows such as recycling, reusing, and remanufacturing in a production environment. This paper addresses a production planning problem which involves reusing of scrap and recycling of waste that occur in the various stages of the production process and remanufacturing/recycling of returns in a closed-loop supply chain environment. An extended material requirement planning (MRP) is proposed as a mixed integer linear programming (MILP) model which includes - beside forward - these reverse material flows. The proposed model is developed for the jewelry industry in Turkey, which uses gold as the primary resource of production. The aim is to manage these reverse material flows as a part of production planning to utilize resources. Considering the mostly unpredictable nature of reverse material flows, the proposed model is likewise transformed into a fuzzy model to provide a better review of production plan for the decision maker. The suggested model is examined through a case study to test the applicability and efficiency.

Orijinal dilİngilizce
Makale numarası7915673
DergiMathematical Problems in Engineering
Hacim2016
DOI'lar
Yayın durumuYayınlandı - 2016

Bibliyografik not

Publisher Copyright:
© 2016 Erhan Yazici et al.

BM SKH

Bu sonuç, aşağıdaki Sürdürülebilir Kalkınma Hedefine/Hedeflerine katkıda bulunur

  1. SKH 9 - Sanayi, Yenilikçilik ve Altyapı
    SKH 9 Sanayi, Yenilikçilik ve Altyapı

Parmak izi

A New Extended MILP MRP Approach to Production Planning and Its Application in the Jewelry Industry' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Alıntı Yap