A multi-stage decision framework for managing hazardous waste logistics with random release dates

Saeed Tasouji Hassanpour, Ginger Y. Ke, Jiahong Zhao*, David M. Tulett

*Bu çalışma için yazışmadan sorumlu yazar

Araştırma sonucu: Dergiye katkıMakalebilirkişi

4 Atıf (Scopus)

Özet

This research develops a multi-stage decision framework for a three-tier collection network for hazardous waste considering random release dates. Applying a cost-based clustering approach, the first stage decisions involve locating the transfer stations and allocating generation nodes to the chosen facilities. The corresponding results, along with a subjective risk-aversion concept and estimated release dates, are utilized to generate an a priori collection plan, which can be further revised once the actual release dates are realized. We performed sensitivity analyses on important model elements, including the subjective risk-aversion parameter and vehicle capacity for collection tours. Our findings indicate that depending on the subjective perspective of the collector, deviations from the original scheduled plan can be a positive or negative phenomenon. For an optimistic decision-maker, adaption to the realized deviations necessitates accepting additional total risk. On the other hand, a pessimistic decision-maker is more likely to benefit from deviations. The findings can provide relevant authorities with practical and realistic strategic and operational decisions.

Orijinal dilİngilizce
Makale numarası120750
DergiExpert Systems with Applications
Hacim232
DOI'lar
Yayın durumuYayınlandı - 1 Ara 2023
Harici olarak yayınlandıEvet