T1 - A methodology of using past experiences in the performance prediction of a TBM in a complex geology
AU - Namli, M.
AU - Cakmak, O.
AU - Pakis, I. H.
AU - Tuysuz, L.
AU - Talu, D.
AU - Dumlu, M.
AU - Balci, C.
AU - Copur, H.
AU - Bilgin, N.
PY - 2013
Y1 - 2013
N2 - Uskudar-Umraniye-Cekmekoy-Sancaktepe metro line of 20 km having two tubes is recently commissioned to Dogus Construction Company by Istanbul Metropolitan Municipality Authorities and it is intended to finish in 38 months. The geology is complex consisting of sandstone, arcosic sandstone mudstone, siltstone, shale, limestone, andesite, and quartzitic conglomerate. The geologic units are frequently cut by andesite dykes having significantly fractured contact zones. The area is highly populated, and the overburden changes between 10-80 m. It is predicted that in some areas it is likely that ancient water wells exist which may cause some severe settlement problems. Two TBMs having diameters of 6.57 m already used in Kadikoy-Kartal metro tunnels are refurbished for the tunnel excavations. Uskudar station will be excavated under sea level. The paper describes briefly the methodology based on the accumulated data from previous experiences for TBM performance prediction to identify critical zones for TBM excavation. It is believed that the concept behind of proposed methodology will serve a sound basis for decision making for similar projects coming very soon.
AB - Uskudar-Umraniye-Cekmekoy-Sancaktepe metro line of 20 km having two tubes is recently commissioned to Dogus Construction Company by Istanbul Metropolitan Municipality Authorities and it is intended to finish in 38 months. The geology is complex consisting of sandstone, arcosic sandstone mudstone, siltstone, shale, limestone, andesite, and quartzitic conglomerate. The geologic units are frequently cut by andesite dykes having significantly fractured contact zones. The area is highly populated, and the overburden changes between 10-80 m. It is predicted that in some areas it is likely that ancient water wells exist which may cause some severe settlement problems. Two TBMs having diameters of 6.57 m already used in Kadikoy-Kartal metro tunnels are refurbished for the tunnel excavations. Uskudar station will be excavated under sea level. The paper describes briefly the methodology based on the accumulated data from previous experiences for TBM performance prediction to identify critical zones for TBM excavation. It is believed that the concept behind of proposed methodology will serve a sound basis for decision making for similar projects coming very soon.
UR - http://www.scopus.com/inward/record.url?scp=84878574214&partnerID=8YFLogxK
U2 - 10.1201/b14769-159
DO - 10.1201/b14769-159
M3 - Conference contribution
AN - SCOPUS:84878574214
SN - 9781138000940
T3 - Underground - The Way to the Future: Proceedings of the World Tunnel Congress, WTC 2013
SP - 1157
EP - 1164
BT - Underground - The Way to the Future
PB - Taylor and Francis - Balkema
T2 - World Tunnel Congress: Underground - The Way to the Future, WTC 2013
Y2 - 31 May 2013 through 7 June 2013
ER -