A gene-wavelet model for long lead time drought forecasting

Ali Danandeh Mehr*, Ercan Kahya, Mehmet Özger

*Bu çalışma için yazışmadan sorumlu yazar

Araştırma sonucu: ???type-name???Makalebilirkişi

82 Atıf (Scopus)

Özet

Drought forecasting is an essential ingredient for drought risk and sustainable water resources management. Due to increasing water demand and looming climate change, precise drought forecasting models have recently been receiving much attention. Beginning with a brief discussion of different drought forecasting models, this study presents a new hybrid gene-wavelet model, namely wavelet-linear genetic programing (WLGP), for long lead-time drought forecasting. The idea of WLGP is to detect and optimize the number of significant spectral bands of predictors in order to forecast the original predictand (drought index) directly. Using the observed El Nin&tild;o-Southern Oscillation indicator (NINO 3.4 index) and Palmer's modified drought index (PMDI) as predictors and future PMDI as predictand, we proposed the WLGP model to forecast drought conditions in the State of Texas with 3, 6, and 12-month lead times. We compared the efficiency of the model with those of a classic linear genetic programing model developed in this study, a neuro-wavelet (WANN), and a fuzzy-wavelet (WFL) drought forecasting models formerly presented in the relevant literature. Our results demonstrated that the classic linear genetic programing model is unable to learn the non-linearity of drought phenomenon in the lead times longer than 3. months; however, the WLGP can be effectively used to forecast drought conditions having 3, 6, and 12-month lead times. Genetic-based sensitivity analysis among the input spectral bands showed that NINO 3.4 index has strong potential effect in drought forecasting of the study area with 6-12-month lead times.

Orijinal dilİngilizce
Sayfa (başlangıç-bitiş)691-699
Sayfa sayısı9
DergiJournal of Hydrology
Hacim517
DOI'lar
Yayın durumuYayınlandı - 9 Eyl 2014

Bibliyografik not

Publisher Copyright:
© 2014 Elsevier B.V.

Parmak izi

A gene-wavelet model for long lead time drought forecasting' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Alıntı Yap