| Date of Award | 2017 |
|---|---|
| Original language | English |
| Supervisor | Esin Ergen Pehlevan (Supervisor) |
Identification of cost factors for integrated alternative cost and time analysis in pre-construction stage
Student thesis: Master's thesis