Replacement study of off-highway trucks in an open-pit coal mine in Turkey

Ayhan Kesimal, Atac Bascetin

Research output: Contribution to journalArticlepeer-review

Abstract

The proper assignment of equipment can be achieved by insuring a timely investment and a timely replacement policy through the mine life. Mine design engineers must constantly decide whether existing assets should be continued in service or whether available new assets will better and more economically meet current and future needs. These decision must be made with increasing frequency as the dynamic side of mining quickly advances and technology produces more rapid changes. Thus the replacement of equipment requires careful engineering economy studies if we are to arrive at sound decisions. This paper reviews dynamic solution approach where all truck fleet are evaluated for each year of the operation. Equivalent annual cost of operation is carried through the analysis. The optimum solution is achieved by selecting the minimum equivalent annual cost at the last year. The solution provides the best equipment replacement policy.

Original languageEnglish
Pages (from-to)279-286
Number of pages8
JournalMineral Resources Engineering
Volume9
Issue number2
DOIs
Publication statusPublished - Apr 2000
Externally publishedYes

Fingerprint

Dive into the research topics of 'Replacement study of off-highway trucks in an open-pit coal mine in Turkey'. Together they form a unique fingerprint.

Cite this