The purpose of this study is to propose a framework to redesign the conventional material supply systems of the automotive supplier companies by considering the demand characteristics and the bill-of materials of the products, on the basis of lean production principles. Especially, pull (Kanban) system, POLCA and kitting were used to replenish components to the assembly line, where appropriate. Pull system and kitting were used in many cases of the automotive sector because of the high material handling costs, space requirements and many product customization requests. Kanban systems were proposed for coordinating the supply of components' with relatively smooth and high demand. For supplying components with low and variable demand, POLCA systems were suggested. Although conventional Kanban systems require replenishment of components by containers, kitting may a better systematic to save space in buffer areas of the assembly lines where products have common components. Therefore, a kitting methodology was also developed in this study, based on clustering of components into the kits. Replenishment of kits of components is coordinated by Kanban. The proposed methodology is applied in an automotive supplier producing air-conditioners. As a result of this application, time spent by the assembly line operators for checking the parts availability was eliminated. Material feeding time was reduced by %80. Time spent by the production planner for controlling the production requirements were reduced by %72.

Original languageEnglish
Title of host publicationIEOM 2015 - 5th International Conference on Industrial Engineering and Operations Management, Proceeding
PublisherInstitute of Electrical and Electronics Engineers Inc.
ISBN (Electronic)9781479960651
DOIs
Publication statusPublished - 23 Apr 2015
Event5th International Conference on Industrial Engineering and Operations Management, IEOM 2015 - Dubai, United Arab Emirates
Duration: 3 Mar 20155 Mar 2015

Publication series

NameIEOM 2015 - 5th International Conference on Industrial Engineering and Operations Management, Proceeding

Conference

Conference5th International Conference on Industrial Engineering and Operations Management, IEOM 2015
Country/TerritoryUnited Arab Emirates
CityDubai
Period3/03/155/03/15

Bibliographical note

Publisher Copyright:
© 2015 IEEE.

Keywords

  • POLCA
  • automotive supplier
  • clustering
  • kanban
  • kitting
  • lean logistics
  • material supply system