Ranking of factors affecting pricing in construction projects by intuitionistic fuzzy analytic hierarchy process with ordered pairs

Research output: Contribution to journalArticlepeer-review

Abstract

The construction industry faces various challenges related to uncertainties in project bids and unstable pricing. These challenges include situations where uncertainties in bid documents can affect project pricing and performance. In order to resolve these uncertainties and clarify project requirements, risks and uncertainties within the document need to be identified early in the project life cycle. This study aims to rank the factors affecting project pricing. For this purpose, firstly, the parameters that have an impact on pricing are defined and then these factors are weighted by using Intuitionistic Fuzzy Analytic Hierarchy Process with Ordered Pairs. The analysis of factors affecting construction pricing reveals some important insights. Environmental uncertainties and uncertainties in prices and labor costs are the most important factors influencing pricing, while past project experience is the least important factor. Overall, these findings shed light on the multifaceted nature of construction pricing, which is shaped by the complex interaction of environmental, economic and market factors.

Original languageEnglish
Pages (from-to)131-141
Number of pages11
JournalNotes on Intuitionistic Fuzzy Sets
Volume30
Issue number2
DOIs
Publication statusPublished - 2024

Bibliographical note

Publisher Copyright:
© 2024 by the Authors.

Keywords

  • Analytic hierarchy process
  • Construction industry
  • Intuitionistic fuzzy sets
  • Pricing