Power Production by Using the Hydroelectric Power Plants and Cost Effect on Electricity Market in Türkiye

  • Irem Duzdar*
  • , Emre Uz
  • , Gulgun Kayakutlu
  • , M. Ozgur Kayalica
  • *Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

Abstract

Power production through hydroelectric power plants is one of the important methods to produce electricity because of the use of alternative resources while considering the climate issues in our current world. On the other hand, growing economies demand energy in the sectors; therefore, energy demand increases correlatively with sustainable economic growth. In this context, increasing power generation, reducing carbon emissions, and reducing energy generation costs by protecting energy reliability are the main objectives in an energy market. Since the climate issues, these aims require the utilization of the renewable energy source maximum at present. Accordingly, this study mainly aims at the economic analysis of the power generation from hydroelectricity in the electricity market for Türkiye by comprehending the contribution of hydroelectric power plants. Since the 2050 roadmap of hydroelectricity might be beneficial to form the scenarios as realistic as possible by considering the hydroelectric capacity in Türkiye, the long-range energy alternative planning (LEAP) model is used to analyze the cost-effectiveness by applying the scenarios. In this way, the acquired data regarding the energy demands and costs in the energy market for the different scenarios are used to make future predictions and aspects in Turkey.

Original languageEnglish
Article number125
JournalOperations Research Forum
Volume6
Issue number3
DOIs
Publication statusPublished - Sept 2025

Bibliographical note

Publisher Copyright:
© The Author(s), under exclusive licence to Springer Nature Switzerland AG 2025.

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 7 - Affordable and Clean Energy
    SDG 7 Affordable and Clean Energy
  2. SDG 8 - Decent Work and Economic Growth
    SDG 8 Decent Work and Economic Growth

Keywords

  • Cost effect
  • Energy market
  • Hydropower
  • Long-range energy alternative planning

Fingerprint

Dive into the research topics of 'Power Production by Using the Hydroelectric Power Plants and Cost Effect on Electricity Market in Türkiye'. Together they form a unique fingerprint.

Cite this