Abstract
A Study for the Optimization of Construction and Operation Costs for Metro Systems This article makes a brief reference to the Ph.D. dissertation by the author. Developing an approach method for, calculating and offering the most appropriate solution to optimize a metro system's construction and operation costs. This includes different alternatives for passenger capacity, train sets, construction methods, etc. In order to optimize the construction and operation costs of a metro line, a software was developed in Microsoft Visual Studio with C# language by using object oriented programming approach. The software uses Big Bang-Big Crunch (BB-BC) algorithm for the optimization process. BB- BC Genetic Algorithm method and results of the Simulator X were used for the optimization. Finally the study also aims to offer a proposed software model which must meet the estimated transport demand for the target year, and also satisfies minimum construction and operating costs, with alternatives.
| Original language | Turkish |
|---|---|
| Pages (from-to) | 7659-7668 |
| Number of pages | 10 |
| Journal | Teknik Dergi/Technical Journal of Turkish Chamber of Civil Engineers |
| Volume | 27 |
| Issue number | 4 |
| Publication status | Published - 2016 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 11 Sustainable Cities and Communities
Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver