Kaziklarda sinyal eşleme yöntemi ve çakilabilirlik analizi

Translated title of the contribution: Pile integrity testing and drivability analysis

Tolga Y. Özüdoǧru, Aykut Şenol, Z. Nil Taylan

Research output: Contribution to journalArticlepeer-review

Abstract

This research presents the methods in determination of pile quality and the two different related case studies. The first part of the research discusses the low-strain pile integrity testing, discontinuities and defects occurred during the construction along the piles. The pile integrity testing results of 96 piles were evaluated that were performed in the field and the mentioned testing method was also simulated using TNOWAVE: SITWAVE with the signal matching technique. The analyses were performed by matching the signal data obtained in the field with the reference signals created by the software for the determination of the pile quality. In the second part of the research, the hammer and pile properties were used as an input for the pile drivability analyses where in this case the inverse technique were applied in order to evaluate the static and dynamic soil properties as well as the accurate soil profile.

Translated title of the contributionPile integrity testing and drivability analysis
Original languageTurkish
Pages (from-to)4793-4810
Number of pages18
JournalTeknik Dergi/Technical Journal of Turkish Chamber of Civil Engineers
Volume20
Issue number3
Publication statusPublished - Jul 2009

Fingerprint

Dive into the research topics of 'Pile integrity testing and drivability analysis'. Together they form a unique fingerprint.

Cite this