Abstract
This paper covers the integration of the wind turbines with the national grids which includes the quality of the power generated at the wind plants, the impact to the power systems and the details of connection systems. The system has been considered in detail together with PSS-E (Power System Simulation for Engineering) software program. The scope of the study consists of two parts: technical and economical. 30 MW Wind Power Plant consisting of 13 pieces of 2.3 MW asynchronous WTG of type 690 V, 50 Hz is investigated due to the grid compliance of WPP according to Turkish Grid Code for Wind Turbines (Annex 18) in technical part. Firstly, the reactive capability of the wind power plant and comparison of it with the requirements of the Grid Code is determined. Secondly, the low voltage right through (LVRT) capability of the wind park is assessed. Finally, the system frequency and voltage test shall be applied. In the economic section, by changing some of technical parameters, cost-benefit analysis of the economic impact will be made in order to get use of maximum wind potential that could be obtained.
Original language | English |
---|---|
Title of host publication | ELECO 2015 - 9th International Conference on Electrical and Electronics Engineering |
Publisher | Institute of Electrical and Electronics Engineers Inc. |
Pages | 415-419 |
Number of pages | 5 |
ISBN (Electronic) | 9786050107371 |
DOIs | |
Publication status | Published - 28 Jan 2016 |
Event | 9th International Conference on Electrical and Electronics Engineering, ELECO 2015 - Bursa, Turkey Duration: 26 Nov 2015 → 28 Nov 2015 |
Publication series
Name | ELECO 2015 - 9th International Conference on Electrical and Electronics Engineering |
---|
Conference
Conference | 9th International Conference on Electrical and Electronics Engineering, ELECO 2015 |
---|---|
Country/Territory | Turkey |
City | Bursa |
Period | 26/11/15 → 28/11/15 |
Bibliographical note
Publisher Copyright:© 2015 Chamber of Electrical Engineers of Turkey.