Skip to main navigation Skip to search Skip to main content

Dispute boards in Turkey for infrastructure projects

  • Pelin Alpkokin*
  • , Murat Samil Capar
  • *Corresponding author for this work
  • Istanbul Technical University
  • MCS Muhendis Construction Management

Research output: Contribution to journalArticlepeer-review

7 Citations (Scopus)

Abstract

We contribute to the literature on alternative dispute resolution through dispute adjudication boards, including their suitability and acceptability, with reference to the Turkish construction industry. Local customs and undertakings are examined as they differ from international practices, which are relatively new to Turkey. Actual dispute cases which have been referred to dispute boards are examined. We also focus on a megaproject, as these experience disputes without exception. Interviews with local professionals on the use of dispute adjudication boards are presented. Findings and recommendations are provided.

Original languageEnglish
Article number100958
JournalUtilities Policy
Volume60
DOIs
Publication statusPublished - Oct 2019

Bibliographical note

Publisher Copyright:
© 2019 Elsevier Ltd

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 9 - Industry, Innovation, and Infrastructure
    SDG 9 Industry, Innovation, and Infrastructure

Keywords

  • Dispute adjudication board
  • Dispute cases
  • Dispute resolution
  • Megaprojects
  • Turkey

Fingerprint

Dive into the research topics of 'Dispute boards in Turkey for infrastructure projects'. Together they form a unique fingerprint.

Cite this