Comparison of pH Adjustment and Electrocoagulation Processes on Treatability of Metal Plating Wastewater

Harun Akif Kabuk, Yasar Avsar, Fatih Ilhan, Kubra Ulucan

Research output: Contribution to journalArticlepeer-review

20 Citations (Scopus)

Abstract

This study includes both the removal of heavy metals and chemical oxidation demand from metal plating wastewater with pH adjustment and electrocoagulation processes and a comparison of these two processes. For the pH adjustment, process experimental works were studied for five pH levels as 6.0, 7.0, 8.0, 9.0, and 10.0. Optimum removal rates obtained at pH 8.0. With these operating conditions, 90% COD removal, 99.9% Zn (II) removal, 92.5% Cu (II) removal, 78.6% Ni (II) removal, and 50.5% Cr (VI) removal efficiencies were gained. For the electrocoagulation process, the optimum working conditions were found using response surface methodology (RSM) with a 5-level, 6-replicate central composite design (CCD). The optimum working conditions of the electrocoagulation process for pH, reaction time, and current density were determined as 8.0, 90 min, and 250 A/m2, respectively. At this condition, 90% COD, 100% Zn, 97% Cu, 90% Ni, and 75% Cr removal efficiencies were obtained. Treatment costs for each process per unit cubic meter wastewater were calculated as $91 and $34.

Original languageEnglish
Pages (from-to)613-618
Number of pages6
JournalSeparation Science and Technology
Volume49
Issue number4
DOIs
Publication statusPublished - Jan 2014
Externally publishedYes

Keywords

  • electrocoagulation
  • heavy metal removal
  • metal plating wastewater
  • optimization
  • pH adjustment
  • response surface methodology

Fingerprint

Dive into the research topics of 'Comparison of pH Adjustment and Electrocoagulation Processes on Treatability of Metal Plating Wastewater'. Together they form a unique fingerprint.

Cite this