TY - GEN
T1 - Analysis of the EPB-TBM excavation parameters used in the second region waste water tunnels construction of european side of Istanbul
AU - Acaroǧlu, Ö
AU - Ekinci, E.
PY - 2013
Y1 - 2013
N2 - Mechanical excavation methods have become widespread in the world and our country and importance of the selection of proper machine is getting increase for achieving efficient excavation. In this study, the excavation parameters of an EPB-TBM machine used in tunnel project which is purpose of collecting the waste water from Eyüp to Yenikapi{dotless} in the ISKI Yenikapi{dotless} Waste Water Plant were analyzed. During the machine passing under a river bed in the Güngören formation, seven ground samples were collected and sieve analyses were made. The ground of continuing, particle size distribution and ground conditioning type were examined by using sieve analysis. After the Güngören formation EPB-TBM was entered in the Trakya Formation and started excavation fractured and jointed claystone. During the excavation in this relatively harder formation, the machine was transformed from EPB to TBM mode, and then some of the wedge cutters were placed with disc cutters for increasing the efficiency of the excavation. During this period, analysis of the excavation parameters were made using the torque, thrust force and those penetration indexes, advance and penetration values rate. This study shows that data obtained from machine gives useful information about formation passing.
AB - Mechanical excavation methods have become widespread in the world and our country and importance of the selection of proper machine is getting increase for achieving efficient excavation. In this study, the excavation parameters of an EPB-TBM machine used in tunnel project which is purpose of collecting the waste water from Eyüp to Yenikapi{dotless} in the ISKI Yenikapi{dotless} Waste Water Plant were analyzed. During the machine passing under a river bed in the Güngören formation, seven ground samples were collected and sieve analyses were made. The ground of continuing, particle size distribution and ground conditioning type were examined by using sieve analysis. After the Güngören formation EPB-TBM was entered in the Trakya Formation and started excavation fractured and jointed claystone. During the excavation in this relatively harder formation, the machine was transformed from EPB to TBM mode, and then some of the wedge cutters were placed with disc cutters for increasing the efficiency of the excavation. During this period, analysis of the excavation parameters were made using the torque, thrust force and those penetration indexes, advance and penetration values rate. This study shows that data obtained from machine gives useful information about formation passing.
UR - http://www.scopus.com/inward/record.url?scp=84901938524&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:84901938524
SN - 9781632662989
T3 - 23rd International Mining Congress and Exhibition of Turkey, IMCET 2013
SP - 1313
EP - 1322
BT - 23rd International Mining Congress and Exhibition of Turkey, IMCET 2013
PB - Chamber of Mining Engineers of Turkey
T2 - 23rd International Mining Congress and Exhibition of Turkey, IMCET 2013
Y2 - 16 April 2013 through 19 April 2013
ER -