Abstract

Small or middle scaled residential projects have a big share in the industry and majority of the fatal accidents usually occur on such work sites. In this study, drawings, technical specifications, bill of quantities of 25 small or middle scaled concrete residential buildings with total areas that vary between 252 and 221.979 m2 in Istanbul were examined. The study aims to give an approach for safety cost estimation for the early stages of construction bidding phase using risk assessment activities and construction project scheduling by focusing on construction activities. Additionally, a cost analysis was performed and the results were compared and Primavera P6 was utilized for scheduling, and risk assessment was conducted using the techniques applicable for construction projects (i.e., L matrix and Fine-Kinney). Finally, activitybased techniques were used for cost estimation. The results of this study reveal that the percentage of occupational health and safety (OHS) cost to the total construction cost is 2.6%. Also, to comply with the current legislation and minimize risks; 0.95 USD per man-hour should be spent according to 2013 rates and OHS cost per unit area was found as approximately 9.37 USD.

Original languageEnglish
Title of host publicationISEC 2015 - 8th International Structural Engineering and Construction Conference
Subtitle of host publicationImplementing Innovative Ideas in Structural Engineering and Project Management
EditorsSwapan Saha, Yixia X. Zhang, S. Yazdani, Amarjit Singh
PublisherISEC Press
Pages869-874
Number of pages6
ISBN (Electronic)9780996043717
DOIs
Publication statusPublished - 2015
Event8th International Structural Engineering and Construction Conference: Implementing Innovative Ideas in Structural Engineering and Project Management, ISEC 2015 - Sydney, Australia
Duration: 23 Nov 2015 → 28 Nov 2015

Publication series

NameISEC 2015 - 8th International Structural Engineering and Construction Conference: Implementing Innovative Ideas in Structural Engineering and Project Management

Conference

Conference8th International Structural Engineering and Construction Conference: Implementing Innovative Ideas in Structural Engineering and Project Management, ISEC 2015
Country/TerritoryAustralia
CitySydney
Period23/11/15 → 28/11/15

Bibliographical note

Publisher Copyright:
Copyright © 2015 ISEC Press.

Keywords

  • Construction accidents
  • Cost of occupational health and safety
  • Occupational health and safety management
  • Risk analysis
  • Scheduling