Abstract
A municipality improves the quality of community life through its projects and actions. However, project selection and prioritization by municipalities are highly complex processes. Therefore, multicriteria decision making (MCDM) methodologies are very suitable for determining the best alternative. Recently, some studies have concentrated on the selection of the best project alternatives. In this paper, a two phased fuzzy MCDM methodology is proposed for the selection among municipal projects. In the first phase, fuzzy TOPSIS method is used to select the main project group and then fuzzy AHP is used to select the best sub-municipal project. The application of the suggested methodology has been made at the central district municipality in Konya, Turkey.
Original language | English |
---|---|
Pages (from-to) | 405-422 |
Number of pages | 18 |
Journal | Technological and Economic Development of Economy |
Volume | 21 |
Issue number | 3 |
DOIs | |
Publication status | Published - 2015 |
Bibliographical note
Publisher Copyright:© 2015 Vilnius Gediminas Technical University (VGTU) Press.
Keywords
- Fuzzy AHP
- Fuzzy TOPSIS
- Integrated fuzzy methodology
- Municipal project selection