A parallel implementation of unscheduled flow control in interconnected power systems

G. Ozdemir Dag, Mustafa Bagriyanik*

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

Abstract

The unscheduled power flow problem needs to be minimized or controlled as soon as possible in a deregulated power system since the transmission systems are mostly operated at their power-carrying limits or very close to it. The time spent for simulations to determine the current states of all the system and control variables of the interconnected power system is important. Taking necessary action in case of any failure of equipment or any other occurrence of an undesired situation could be critical. Using supercomputing facilities and parallel computing techniques together decreases the computation time greatly. In this study, a parallel implementation of a multiobjective optimization approach based on both genetic algorithms and fuzzy decision making to manage unscheduled flows is presented. Parallel computation techniques are applied using supercomputers (high-performance computers). The proposed method is applied to the IEEE 300 bus test system. Two different cases for some parameters of GA are considered to see the power of parallel computation technique. Then the simulation results are presented.

Original languageEnglish
Article number376291
JournalMathematical Problems in Engineering
Volume2012
DOIs
Publication statusPublished - 2012

Fingerprint

Dive into the research topics of 'A parallel implementation of unscheduled flow control in interconnected power systems'. Together they form a unique fingerprint.

Cite this