Abstract
Project scheduling is a vital topic for shipbuilding industry. For a regular production process a realistic plan is needed. When prepared scheduling is away from actual conditions and inconvenient, it is so difficult to follow it. Thus, production process proceeds on its own and controlling the work becomes impossible. Instead of a best solution an optimum solution is advised because finding the best solution is often hard, time consuming and expensive. In this study a dynamic scheduling model is proposed to acquire an optimum production plan for shipbuilding. Actual performance inclusion into the production scheduling procedure is provided in the cause of reflecting real production environment conditions. Therefore, it is expected that a more realistic schedule can be obtained with the model presented in this paper.
Original language | English |
---|---|
Title of host publication | Maritime Transportation and Harvesting of Sea Resources |
Editors | C. Guedes Soares, Angelo P. Teixeira |
Publisher | CRC Press/Balkema |
Pages | 749-756 |
Number of pages | 8 |
ISBN (Print) | 9780815379935, 9780815379935 |
Publication status | Published - 2018 |
Event | 17th International Congress of the International Maritime Association of the Mediterranean, IMAM 2017 - Lisbon, Portugal Duration: 9 Oct 2017 → 11 Oct 2017 |
Publication series
Name | Maritime Transportation and Harvesting of Sea Resources |
---|---|
Volume | 2 |
Conference
Conference | 17th International Congress of the International Maritime Association of the Mediterranean, IMAM 2017 |
---|---|
Country/Territory | Portugal |
City | Lisbon |
Period | 9/10/17 → 11/10/17 |
Bibliographical note
Publisher Copyright:© 2018 Taylor & Francis Group, London.