Keyphrases
Optimization Approach
100%
Assembly Line Design
100%
U-shaped Assembly Line
100%
Rabbit Chase
100%
Light Industry
100%
Assembly Line
35%
Walking Worker
29%
Worker number
23%
Space Constraints
17%
Light-emitting Diodes
11%
Assembly System
11%
Mathematical Programming Method
11%
Task Assignment
11%
Adaptation
5%
Design Methodology
5%
Effective Techniques
5%
Manufacturing Firms
5%
Methodical Aspects
5%
Line Performance
5%
One-piece Flow
5%
Solution Quality
5%
Line Design
5%
Coefficient of Variation
5%
Assembly Line Balancing
5%
Goal Programming Model
5%
Assessing Capacity
5%
Walking Distance
5%
Internal Logistics
5%
Solution Approach
5%
Line Workers
5%
Capacity Management
5%
Computational Burden
5%
Walking Time
5%
Preemptive Goal Programming
5%
Computational Efficiency
5%
U-type Lines
5%
U-lines
5%
Load Balancing
5%
Manufacturing Systems
5%
Linear Programming Model
5%
Line Configuration
5%
Hierarchical Manner
5%
Increased Productivity
5%
Time Performance
5%
Balance Problem
5%
Walking Space
5%
Engineering
Optimization Approach
100%
Assembly Line
100%
Light-Emitting Diode
9%
Assembly System
9%
Programming Model
9%
Luminaires
9%
Realization
4%
Gas Fuel Manufacture
4%
Adaptability
4%
Computational Efficiency
4%
Manufacturing Company
4%
Internals
4%
Assembly Line Balancing
4%
Coefficient of Variation
4%
Lead Time
4%
Linear Programming
4%