Project Details
Short title | Turning circle tests with system based simulations including wave drift |
---|---|
Status | Finished |
Effective start/end date | 26/08/22 → 27/02/23 |
Project: Research › SRP
Short title | Turning circle tests with system based simulations including wave drift |
---|---|
Status | Finished |
Effective start/end date | 26/08/22 → 27/02/23 |