Projects per year
Search results
-
Active
Yolindi (Biga, Çanakkale) Fe-Cu skarn cevherleşmesinin evrimi: Mineralojik, jeokimyasal ve izotopik yaklaşımlar
Kumral, M. (PI)
24/04/23 → 24/04/25
Project: Research › SRP
-
Tereksay Celalabad Kırgızistan Kuzeybatısındaki Au Cevherleşmesinin Jeolojik ve Ekonomik Özellikleri
Kumral, M. (PI)
24/04/23 → 24/04/26
Project: Research › SRP
-
Design optimization of access roads and networks in hard-rock underground mines
Kumral, M. (PI)
1/01/19 → …
Project: Research › EU
-
Innovation mine optimization tailored to iron ore operations: long and short term planning with dynamic truck dispatching
Kumral, M. (PI)
1/01/17 → …
Project: Research › EU
-
-
Tri-cone rotary drill bit wear monitoring, in-situ geology recognition, vibration analysis and control
Hassani, F. F. (PI), Brochu, M. M. (CoPI), Chromik, R. R. (CoPI) & Kumral, M. (CoPI)
1/01/14 → …
Project: Research › EU
-
Enterprise-wide risk management of mining operations in a value chain environment
Kumral, M. (PI)
1/01/14 → …
Project: Research › EU